public static enum JapaneseCalendar.Unit extends Enum<JapaneseCalendar.Unit> implements ChronoUnit
Defines some calendar units for the Japanese calendar.
| Enum Constant and Description |
|---|
DAYS
Standard unit for days.
|
ERAS
The fuzzy unit of a nengo respective era.
|
MONTHS
The unit of a gregorian or lunisolar month.
|
WEEKS
The Japanese calendar uses a 7-day-week.
|
YEARS
The unit of a gregorian or lunisolar year.
|
| Modifier and Type | Method and Description |
|---|---|
long |
between(JapaneseCalendar start,
JapaneseCalendar end)
Calculates the difference between given Japanese dates in this unit.
|
double |
getLength()
Defines the typical length of this time unit in seconds without
taking into account anomalies like timezone effects or leap seconds.
|
boolean |
isCalendrical()
Queries if this time unit is calendrical respective is at least
as long as a calendar day.
|
static JapaneseCalendar.Unit |
valueOf(String name)
Returns the enum constant of this type with the specified name.
|
static JapaneseCalendar.Unit[] |
values()
Returns an array containing the constants of this enum type, in
the order they are declared.
|
public static final JapaneseCalendar.Unit ERAS
The fuzzy unit of a nengo respective era.
Nengos have very different and unpredictable lengths. Time4J uses Integer.MAX_VALUE
as length to indicate this behaviour. If any nengo is one of the northern court (1332-1393)
then it will first be converted to its southern court equivalent before applying any era arithmetics.
If necessary in case of addition, Time4J will adjust the smaller elements year-of-nengo, month-of-year and day-of-month such that they still fit within the context of the newly calculated nengo. However, the main purpose of this unit is to count the nengo distance between two Japanese dates.
public static final JapaneseCalendar.Unit YEARS
The unit of a gregorian or lunisolar year.
Note that lunisolar years sometimes consist of 13 instead of 12 months.
public static final JapaneseCalendar.Unit MONTHS
The unit of a gregorian or lunisolar month.
Note: The month arithmetic is limited to amounts smaller than 25000
otherwise an ArithmeticException will be thrown.
public static final JapaneseCalendar.Unit WEEKS
The Japanese calendar uses a 7-day-week.
public static final JapaneseCalendar.Unit DAYS
Standard unit for days.
CalendarDayspublic static JapaneseCalendar.Unit[] values()
for (JapaneseCalendar.Unit c : JapaneseCalendar.Unit.values()) System.out.println(c);
public static JapaneseCalendar.Unit valueOf(String name)
name - the name of the enum constant to be returned.IllegalArgumentException - if this enum type has no constant with the specified nameNullPointerException - if the argument is nullpublic double getLength()
ChronoUnitDefines the typical length of this time unit in seconds without taking into account anomalies like timezone effects or leap seconds.
Important note: This method can only yield an estimated value and is not intended to assist in calculations of durations, but only in sorting of units.
getLength in interface ChronoUnitpublic boolean isCalendrical()
ChronoUnitQueries if this time unit is calendrical respective is at least as long as a calendar day.
Implementation note: The method must be consistent with the typical
length of the unit. The expression
Double.compare(unit.getLength(), 86400.0) >= 0 is
equivalent to unit.isCalendrical().
isCalendrical in interface ChronoUnittrue if at least as long as a day else falsepublic long between(JapaneseCalendar start, JapaneseCalendar end)
Calculates the difference between given Japanese dates in this unit.
start - start date (inclusive)end - end date (exclusive)Copyright © 2014–2021. All rights reserved.