static WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.builder() |
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.costCurrency(String costCurrency) |
The currency of the estimated cost.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.costCurrency(CurrencyCode costCurrency) |
The currency of the estimated cost.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.createdAt(Instant createdAt) |
The timestamp when the workload estimate was created.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.expiresAt(Instant expiresAt) |
The timestamp when the workload estimate will expire.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.failureMessage(String failureMessage) |
An error message if the workload estimate creation or processing failed.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.id(String id) |
The unique identifier of the workload estimate.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.name(String name) |
The name of the workload estimate.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.rateTimestamp(Instant rateTimestamp) |
The timestamp of the pricing rates used for the estimate.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.rateType(String rateType) |
The type of pricing rates used for the estimate.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.rateType(WorkloadEstimateRateType rateType) |
The type of pricing rates used for the estimate.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.status(String status) |
The current status of the workload estimate.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.status(WorkloadEstimateStatus status) |
The current status of the workload estimate.
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.toBuilder() |
|
WorkloadEstimateSummary.Builder |
WorkloadEstimateSummary.Builder.totalCost(Double totalCost) |
The total estimated cost for the workload.
|